Chronicle of Work

Chronicle of Work

10/30/2024

Аrsky Branch

“Arsk – Bolshaya Atnya” – Koshlauch: 2+945 - 4+431 (Arsky district)

Works are finished.

10/30/2024

Аrsky Branch

Alan-Bekser – Isleytarsky forestry: 2+400 - 3+000 (Vysokogorsky district)

Works are finished. 

10/23/2024

Menzelinsky Branch

Menzelinsk – Russkiy Karan – Togashevo:  14+645 - 20+013 (Menzelinsky district)

Strengthening of roadsides with macadam.

10/21/2024

Аrsky Branch

Kurkachi – Verkhnyaya Iya: 3+000 – 5+500 (Vysokogorsky district)

Works are finished. 

10/19/2024

Menzelinsky Branch

“M-7 “Volga” – Konovalovka” – Staraya Ashpala:  2+860 - 4+627; 0+000 - 0+500; 0+000 - 0+134 (Menzelinsky district)

Strengthening of roadsides with macadam. Road marking.

10/18/2024

Аrsky Branch

Access road to Tiulyachi area centre: 2+845 - 3+299; 3+665 - 5+395 (Tiulyachinsky district)

Works are finished.

10/17/2024

Aksubaevsky Branch

Alekseyevskoye – Almetyevsk: 51+500 - 61+400 (Aksubayevsky district)

Works are finished.

10/15/2024

Buinsky Branch

Staroye Drozhzhanoye – Tatarskiye Shatrashany – Gorodistche: 5+000 - 7+000 (Drozhzhanovsky district)

Works are finished.

10/14/2024

Buinsky Branch

Access road to Koshki-Novotimbayevo settlement: 0+000 - 0+855 (Tetiushsky district)

Works are finished.

10/14/2024

Buinsky Branch

“Buinsk – Yalchiki” – Isakovo: 6+274 - 8+445 (Buinsky district)

Works are finished.

10/13/2024

Аrsky Branch

“Arsk – Bolshaya Atnya” – Koshlauch: 2+945 - 4+431 (Arsky district)

Construction of surface course with porous mastics asphaltic mix (grade 8, thickness 0.04 m).

10/10/2024

Аrsky Branch

Access road to Kara-Shirma village: 0+000 - 1+000 (Tiulyachinsky district)

Construction of surface course with 0.07 m thick А22Вн asphalt-concrete mix.

10/10/2024

Аrsky Branch

Alan-Bekser – Isleytar forestry: 2+400 - 3+000 (Vysokogorsky district)

Construction of surface course with macadam-and-mastics asphaltic mix (grade 8, thickness 0.04 m).

10/09/2024

Аrsky Branch

Bolshaya Atnya – Chepchugy: 7+455 - 9+608 (Atninsky district)

Works are finished.

10/09/2024

Аrsky Branch

“Kazan – Shemordan” – Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)

Works are finished.

10/08/2024

Аrsky Branch

Access road to Tiulyachi area centre: 2+845 - 3+299; 3+665 - 5+395 (Tiulyachinsky district)

Construction of surface course with macadam-and-mastics asphaltic mix (grade 8, thickness 0.04 m).

10/08/2024

Аrsky Branch

Kurkachi – Verkhnyaya Iya: 3+000 - 5+500 (Vysokogorsky district)

Construction of surface course with macadam-and-mastics asphaltic mix (grade 8, thickness 0.04 m).

10/08/2024

Menzelinsky Branch

Menzelinsk – Russkiy Karan – Togashevo: 14+645 - 20+013 (Menzelinsky district)

Construction of surface course with macadam-and-mastics asphaltic mix (grade 8).

10/04/2024

Suburban Branch

Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 - 2+980 (Laishevsky district)

Works are finished.

10/03/2024

Аrsky Branch

Access road to Tiulyachi area centre: 2+845 - 3+299; 3+665 - 5+395 (Tiulyachinsky district)

Construction of surface course with А22Вн asphalt-concrete mix is finished.

10/03/2024

Аrsky Branch

Bolshaya Atnya – Chepchugy: 7+455 - 9+608 (Atninsky district)

Strengthening of roadsides with M-400 Macadam with granular asphalt gutting up to 11 cm.

10/03/2024

Suburban Branch

Stolbistche – Atabayevo:  6+964 - 7+326 (Laishevsky district)

Horizontal road marking.

10/01/2024

Аrsky Branch

Access road to Kara-Shirma village: 0+000 - 1+000 (Tiulyachinsky district)

Construction of M-400 macadam base course is finished.

09/30/2024

Аrsky Branch

Alan-Bekser – Isleytar forestry: 2+400 - 3+000 (Vysokogorsky district)

Construction of base course with 0.06 m thick А22Нл hot asphalt-concrete mix is finished.

09/30/2024

Аrsky Branch

Access road to Tiulyachi area centre: 2+845 - 3+299; 3+665 - 5+395 (Tiulyachinsky district)

Stabilization and strengthening of soils with non-organic binders (lime 2%, depth 20 cm) using regenerator-mixer is finished.

09/30/2024

Menzelinsky Branch

"Aktanysh – Poisevo” - Staroye Tlyakeyevo: 0+280 - 1+815 (Aktanyshsky district)

Construction of road base course.

09/27/2024

Menzelinsky Branch

Musliumovo – Saklov-Bash – Yultimerovo: 30+700 - 32+700 (Sarmanovsky district)

Construction of road base course.

09/26/2024

Menzelinsky Branch

Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)

Works are finished. 

09/25/2024

Menzelinsky Branch

“Aktanysh – Poisevo” - Bulyak: 5+100 - 9+920 (Aktanyshsky district)

Construction of road base course with А32Нн asphalt-concrete mix.

09/25/2024

Menzelinsky Branch

“M-7 “Volga” – Konovalovka” - Staraya Ashpala: 2+860 - 4+627; 0+000 - 0+500; 0+000 - 0+134 (Menzelinsky district)

Construction of surface course with macadam-and-mastics asphalt mix (grade 8).

09/24/2024

Аrsky Branch

“Arsk – Bolshaya Atnya” - Koshlauch: 2+945 - 4+431 (Arsky district)

Construction of roadbed over a rectangular concrete pipe.

09/23/2024

Аrsky Branch

Kurkachi – Verkhnyaya Iya: 3+000 - 5+500 (Vysokogorsky district)

Construction of 0.07 m thick road base course with hot А32Нн asphalt-concrete mix.

09/23/2024

Suburban Branch

Access road to OAO “Kazan Fat-processing Plant”: 0+000 - 2+180 (Laishevsky district)

Milling of asphalted surface, stabilization of soil with cement.

09/23/2024

Suburban Branch

M-7 “Volga” (Federal auto roads)

Cleaning of the driveway with vacuum sweeper. 

09/18/2024

Buinsky Branch

Works at municipal auto roads in Buinsky district of the Republic of Tatarstan: 0+000 - 0+416 (Buinsky district)

 Construction of surface course with А5Вл asphaltic mix.

09/18/2024

Buinsky Branch

Staroye Drozhzhanoye – Tatarskiye Shatrashany: 0+000 - 0+600 (Drozhzhanovsky district)

Milling of asphalted surface.

09/18/2024

Buinsky Branch

Access road to settlement Koshky-Novotimbayevo: 0+000 - 0+855 (Tetiushsky district)

Construction of asphaltic binder and surface course.

09/18/2024

Buinsky Branch

Staroye Drozhzhanoye – Tatarskiye Shatrashany - Gorodistche: 5+000 - 7+000 (Drozhzhanovsky district)

Construction of asphaltic binder and surface course.

09/17/2024

Menzelinsky Branch

Menzelinsk – Russkiy Karan – Togashevo: 14+645 - 20+013 (Menzelinsky district)

Construction of macadam-and-sand road base course.

09/17/2024

Menzelinsky Branch

Street network in Mellya-Tamak settlement: 0+000 - 1+233; 0+000 - 0+860; 0+000 - 0+927 (Musliumovsky district)

Strengthening of roadsides with macadam.

09/17/2024

Menzelinsky Branch

Local roads maintenance in Aktanyshsky district of the republic of Tatarstan (Aktanyshsky district)

Mowing of the grass on slopes and roadsides.

09/16/2024

Аrsky Branch

“Kazan – Shemordan” – Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)

Construction of 0.02 m thick surface course with macadam-and-mastics asphalt mix (grade 5).

09/14/2024

Aksubaevsky Branch

“Aksubayevo – Fedorovka” – Novaya Balanda – Novoye Mokshino: 1+574 - 8+296 (Aksubayevsky district)

Construction of asphaltic binder and surface course.

09/12/2024

Suburban Branch

Kazan – Shemordan: 21+977 - 22+777 (Pestrechinsky district)

Horizontal road marking.

09/11/2024

Aksubaevsky Branch

Kuzaykino – Nurlat: 41+057 - 42+207; 46+070 - 49+939 (Cheremshansky district)

 Construction of surface course with macadam-and-mastics asphalt mix (grade 8).

09/10/2024

Аrsky Branch

Alan-Bekser – Isleytarsky forestry: 2+400 - 3+000 (Vysokogorsky district)

Construction of 0.18 m high roadbed using cold recycling method with addition of M-800 macadam.

09/06/2024

Suburban Branch

"Kazan – Borovoye Matiushino” – Peschanye Kovaly – “Stolbistche – Atabayevo”: 2+500 - 3+100 (Laishevsky district)

Milling of the asphalt-concrete surface.

09/05/2024

Suburban Branch

Kamenka – Dubyazy – Bolshaya Atnya: 2+581 - 2+731 (Vysokogorsky district)

Horizontal road marking. 

09/04/2024

Аrsky Branch

Bolshaya Atnya – Chepchiugy: 7+455 – 9+608 (Atninsky district)

Construction of 4 cm thick surface layer with stone mastics (grade 8).

09/04/2024

Аrsky Branch

Kazan – Shemordan: 64+396 - 64+975; 84+830 - 85+285 (Tiulyachinsky district)

Works are finished.

09/03/2024

Apastovsky Branch

Road network, roads with macadam-and-sand mix (Apastovsky district) 2024: 0+000 - 0+150; 0+000 - 0+432; 0+000 - 0+200; 0+000 - 0+432; 0+000 - 0+200 (Apastovsky district)

Construction of earth roadbed and stabilization of soil with lime.

09/03/2024

Аrsky Branch

Kurkachi – Verkhnyaay Iya: 3+000 - 5+500 (Vysokogorsky district)

Construction of sandy subbase 20 cm thick.

08/29/2024

Apastovsky Branch

Krasnovidovo – Siukeyevo: 5+935 - 9+000 (Kamsko-Ustyinsky district)

Construction of surface layer with stone mastics (grade 8).

08/29/2024

Apastovsky Branch

Local road maintenance in Kamsko-Ustyinsky district of the Republic of Tatarstan (Kamsko-Ustyinsky district)

Reconstruction of auto roads is finished.

08/27/2024

Suburban Branch

Stolbistche – Atabayevo: 6+964 - 7+326 (Laishevsky district)

Construction of surface layer with stone mastics (grade 8).

08/27/2024

Sabinsky Branch

Access road to Malaya Chura settlement: 0+000 - 1+910 (Kukmorsky district)

Construction of 2 cm thick surface layer with stone mastics (grade 5).

08/26/2024

Menzelinsky Branch

Access road to “Bulyak” municipal educational centre: 0+000 - 0+206 (Aktanyshsky district)

Construction of surface course of the auto road.

08/23/2024

Apastovsky Branch

“Kazan – Ulyanovsk” – Kamskoye Ustye:  0+000 - 2+930 (Verkhneuslonsky district)

Construction of surface layer with stone mastics (grade 8) is finished.

08/23/2024

Suburban Branch

Kazan – Shemordan:  21+977 - 22+777 (Pestrechinsky district)

Construction of surface layer with stone mastics (grade 20).

08/23/2024

Аrsky Branch

Ashitbash – Shushmabash – Karaduvan: 22+900 - 24+800 (Arsky district)

Works are finished.

08/22/2024

Apastovsky Branch

Road network, asphalted roads (Apastovsky district) 2024: 0+000 - 0+290; 0+000 - 0+307; 0+000 - 0+150 (Apastovsky district)

Works are finished.

08/22/2024

Аrsky Branch

Kazan – Shemordan:  64+396 - 64+975; 84+830 - 85+285 (Tiulyachinsky district)

Strengthening of slopes with 10 cm thick granular asphalt. 

08/22/2024

Аrsky Branch

Bolshaya Atnya – Chepchiugy: 7+455 – 9+608 (Atninsky district)

Construction of 4 cm thick surface layer with stone mastics (grade 8).

08/22/2024

Аrsky Branch

“Arsk - Bolshaya Atnya” - Koshlauch: 2+945 - 4+431 (Arsky district)

Construction of levelling course with А32Он asphalt-concrete mix.

08/20/2024

Mamadyshsky Branch

Mamadysh – Kukmor: 28+923 - 30+729 (Mamadyshsky district)

Laying of asphalt-concrete surface course.

08/20/2024

Mamadyshsky Branch

Local road maintenance in Mamadyshsky district of the Republic of Tatarstan (Mamadyshsky district)

Pothole patching on the auto roads.

08/20/2024

Mamadyshsky Branch

M-7 “Volga” – Mamadysh:  0+000 - 0+506; 0+806 - 3+515 (Mamadyshsky district)

Workers of our company conduct construction works.

08/20/2024

Suburban Branch

Rybnaya Sloboda – Yanchikovo: 6+258 - 8+058 (Rybno-Slobodsky district)

Horizontal road marking.

08/20/2024

Suburban Branch

M-7 “Volga” (Federal auto roads)

Summer road maintenance.

08/20/2024

Suburban Branch

Local road maintenance in Vysokogorsky district of the Republic of Tatarstan (Vysokogorsky district)

Summer road maintenance.

08/19/2024

Menzelinsky Branch

Road network in Mellya-Tamak settlement: 0+000 - 1+233; 0+000 - 0+860; 0+000 - 0+927 (Musliumovsky district)

Construction of asphalt-concrete road surface. 

08/15/2024

Menzelinsky Branch

“Aktanysh – Poisevo” – Bulyak: 5+100 - 9+920 (Aktanyshsky district)

Construction of macadam-and-sand subbase.

08/15/2024

Mamadyshsky Branch

M-7 “Volga” – Mamadysh:  0+000 - 0+506; 0+806 - 3+515 (Mamadyshsky district)

Milling of auto road surface.

08/15/2024

Sabinsky Branch

Access road to Malaya Chura settlement: 0+000 - 1+910 (Kukmorsky district)

Construction of base course of the asphaltic road surface.

08/13/2024

Suburban Branch

Local road maintenance in Rybno-Slobodsky district of the Republic of Tatarstan (Rybno-Slobodsky district)

Installation of metal barriers. 

08/12/2024

Suburban Branch

Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 - 2+980 (Laishevsky district)

Construction of surface layer with stone mastics (grade 8).

08/09/2024

Sabinsky Branch

Chita – Kryash-Serda: 0+000 - 2+200 (Pestrechinsky district)

Workers of our company conduct construction of surface layer with stone mastics (grade 8).

08/08/2024

Menzelinsky Branch

Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)

Strengthening of roadsides with macadam.

08/07/2024

Suburban Branch

Stolbische – Atabayevo: 6+964 - 7+326 (Laishevsky district)

Construction of base course of the auto road with А32Нт asphalt-concrete mix.

08/07/2024

Menzelinsky Branch

Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)

Construction of surface layer with stone mastics (grade 8).

08/03/2024

Sabinsky Branch

Ash-Buzy – Mamashire: 4+203 - 8+213 (Kukmorsky district)

Construction of base course of the asphalt-concrete auto road.

08/02/2024

Аrsky Branch

Access road to Tiulyachy district center:  2+845 - 3+299; 3+665 - 5+395 (Tiulyachinsky district)

Milling of asphalted surface to the depth of 0.10 m.

08/02/2024

Аrsky Branch

Bolshaya Atnya – Chepchugy: 7+455 - 9+608 (Atninsky district)

Construction of 7 cm thick base course with А32Нн asphalt-concrete mix.

08/02/2024

Suburban Branch

Stolbische – Atabayevo: 6+964 - 7+326 (Laishevsky district)

Construction of roadbed with С-4 М-800 macadam-and-sand mix.

08/01/2024

Suburban Branch

Rybnaya Sloboda – Yanchikovo: 6+258 - 8+058 (Rybno-Slobodsky district)

Strengthening of roadsides with M-400 macadam. 

07/31/2024

Menzelinsky Branch

Menzelinsk – Russkiy Karan – Togashevo: 14+645 - 20+013 (Menzelinsky district)

Construction of road base course using cold recycling method. 

07/31/2024

Menzelinsky Branch

“M-7 “Volga” – Konovalovka” – Staraya Ashpala: 2+860 - 4+627; 0+000 - 0+500; 0+000 - 0+134 (Menzelinsky district)

Construction of auto road subbase.

07/30/2024

Suburban Branch

Kazan – Shemordan: 21+977 - 22+777 (Pestrechinsky district)

Construction of roadbed with С-4 М-800 macadam-and-sand mix on the access ramp.

07/29/2024

Aksubaevsky Branch

Kuzaykino – Nurlat: 41+057 - 42+207; 46+070 - 49+939 (Cheremshansky district)

Workers of JSC “Tatavtodor” conduct construction works.

07/29/2024

Suburban Branch

Stolbische – Atabayevo: 6+964 - 7+326 (Laishevsky district)

Construction of earth roadbed.

07/26/2024

Suburban Branch

Kamenka – Dubyazy – Bolshaya Atnya: 2+581 - 2+731 (Vysokogorsky district)

Construction of roadbed with С-4 М-800 macadam-and-sand mix.

07/26/2024

Suburban Branch

P-239 Kazan – Orenburg, access road to Kazan Airport (Federal auto roads)

Cleaning of the driveway with vacuum sweeping machine.

07/26/2024

Nizhnekamsky Branch

Road junction on “Chistopol – Nizhnekamsk” auto road: 0+000 - 3+880 (Nizhnekamsky district)

Construction of asphalted surface course with stone mastics (grade 16).

07/25/2024

Mamadyshsky Branch

Malaya Shilna – Bolshaya Shilna: 0+000 - 3+060 (Tukayevsky district)

Construction of surfacing layer with black macadam.

07/25/2024

Mamadyshsky Branch

Mamadysh – Kukmor: 28+923 - 30+729 (Mamadyshsky district)

Stabilization of earth bed and construction of road surfacing.

07/24/2024

Mamadyshsky Branch

Maintenance works on local roads in Mamadyshsky district of the Republic of Tatarstan (Mamadyshsky district)

Summer road maintenance.

07/23/2024

Menzelinsky Branch

“M-7 “Volga” – Konovalovka” – Staraya Ashpala: 0+000 - 2+860 (Menzelinsky district)

Soil liming.


07/23/2024

Menzelinsky Branch

Menzelinsk – Russkiy Karan – Togashevo: 14+645 - 20+013 (Menzelinsky district)

Construction of road base course using cold recycling method. 

07/22/2024

Suburban Branch

Stolbische – Atabayevo: 6+964 - 7+326 (Laishevsky district)

Stabilization of soil with lime.

07/22/2024

Suburban Branch

Kamenka – Dubyazy – Bolshaya Atnya: 2+581 - 2+731 (Vysokogorsky district)

Stabilization of soil with lime.

07/22/2024

Menzelinsky Branch

Maintenance works on local roads in Aktanyshsky district of the Republic of Tatarstan (Aktanyshsky district)

Mowing of the grass with tractor-mounted mower.

07/22/2024

Suburban Branch

Maintenance works on local roads in Rybno-Slobodsky district of the Republic of Tatarstan (Rybno-Slobodsky district)

Strengthening of roadsides is finished. 

07/19/2024

Аrsky Branch

“Kazan – Shemordan” - Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)

Construction of leveling course with А16Нн asphalt-concrete mix.   

07/19/2024

Buinsky Branch

Access road to Koshki-Novotimbayevo settlement: 0+000 - 0+855 (Tetiushsky district)

Workers of our company conduct construction of roadbed with macadam-and-sand mix.

07/19/2024

Buinsky Branch

“Buinsk – Yalchiki” – Isakovo: 6+274 - 8+445 (Buinsky district)

Stabilization of soil with cement.

07/18/2024

Аrsky Branch

“Kazan – Shemordan” - Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)

Construction of 0.07 m thick base course with А22Нн asphalt-concrete mix.

07/18/2024

Menzelinsky Branch

Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)

Construction of bus stations for bus stop pavilions.

07/18/2024

Menzelinsky Branch

“M-7 “Volga” – Konovalovka” – Staraya Ashpala: 0+000 - 2+860 (Menzelinsky district)

Preparation of base with sand-and-gravel mix, emulsion pouring. 

07/18/2024

Suburban Branch

Maintenance works on local roads in Rybno-Slobodsky district of the Republic of Tatarstan (Rybno-Slobodsky district)

Mowing of the grass on roadsides and slopes.

07/17/2024

Suburban Branch

Maintenance works on local roads in Vysokogorsky district of the Republic of Tatarstan (Vysokogorsky district)

Reconstruction of worn-out layers of asphaltic surface on the “Bypass of Aldermysh settlement” auto road. 

07/17/2024

Suburban Branch

P-239 Kazan – Orenburg (Federal auto roads)

Summer road maintenance.

07/17/2024

Аrsky Branch

Kazan – Shemordan: 64+396 - 64+975; 84+830 - 85+285 (Tiulyachinsky district)

Construction of surface layer with stone mastics (grade 8, 0.04 m thick).

07/17/2024

Аrsky Branch

“Kazan – Shemordan” - Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)

Construction of 0.20 m thick roadbed with М-400 macadam.

07/16/2024

Аrsky Branch

Kazan – Shemordan: 64+396 - 64+975; 84+830 - 85+285 (Tiulyachinsky district)

Milling of the asphalted surface.

Construction of leveling course of А16Нт mix.

07/16/2024

Аrsky Branch

Kurkachi – Verkhnyaya Iya: 3+000 – 5+500 (Vysokogorsky district)

Construction of the ground base course stabilized with lime.

07/16/2024

Аrsky Branch

"Kazan – Shemordan" – Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)

Construction of the additional base course with sand, 0.20 m thick.

07/13/2024

Menzelinsky Branch

Musliumovo – Staroye Saitovo: 16+000 – 18+200 (Musliumovsky district)

Works are finished.

07/12/2024

Sabinsky Branch

Chita – Kryash-Serda: 0+000 – 2+200 (Pestrechinsky district)

Construction of base course using cold regeneration method.

07/12/2024

Buinsky Branch

Access road to settlement Koshky – Novotimbayevo: 0+000 – 0+855 (Tetiushsky district)

Stabilization of soil with lime.

07/10/2024

Buinsky Branch

Staroye Drozhzhanoye – Tatarskiye Shatrashany – Gorodische: 5+000 – 7+000 (Drozhzhanovsky district)

Stabilization of soil with cement and construction of macadam-and-sand base course.

07/09/2024

Apastovsky Branch

"Kazan – Ulyanovsk" – Apastovo – Ulanovo – Karatun: 0+000 – 1+951 (Apastovsky district)

Deconstruction of macadam base course on the drive way, strengthening of soil with cement, construction of sandy sub-base, construction of geogrid and base course of macadam-and-sand mix.

07/09/2024

Apastovsky Branch

"Kazan – Ulyanovsk" – Kamskoye Ustye: 0+000 – 2+930 (Verkhneuslonsky district)

Milling of asphalted surface is finished.

07/05/2024

Apastovsky Branch

"Kazan – Ulyanovsk" – Apastovo – Ulanovo – Karatun: 0+000 – 1+951 (Apastovsky district)

Peg 0+00-peg 7+51, peg 9+60-peg 17+25, peg 18+14-peg19+50.

Regeneration of asphalted surface with addition of macadam is finished.

07/05/2024

Buinsky Branch

"Buinsk – Yalchiki" – Isakovo: 6+274 – 8+445 (Buinsky district)

Construction of earth road bed.

07/05/2024

Suburban Branch

Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 – 2+980 (Laishevsky district)

Construction of base course of C4 macadam-and-sand mix (grade 800).

07/05/2024

Aksubaevsky Branch

Alekseyevskoye – Almetyevsk: 51+500 – 61+400 (Aksubayevsky district)

Construction of surface course of SMA-16.

07/04/2024

Suburban Branch

Kamenka – Dubyazy – Boslshaya Atnya: 13+800 – 15+100 (Vysokogorsky district)

Works are finished on site.

07/03/2024

Nizhnekamsky Branch

Traffic interchange on "Chistopol – Nizhnekamsk" auto road: 0+000 – 3+880 (Nizhnekamsky district)

Construction if surface course with А32ОТ asphalt-concrete mix.

07/03/2024

Suburban Branch

Local roads maintenance in Laishevsky district of the Republic of Tatarstan (Laishevsky district)

Summer road maintenance.

07/03/2024

Suburban Branch

M-7 Volga (Federal auto roads)

Access road to Kirov city. Mowing of the grass on roadsides and slopes.

07/01/2024

Apastovsky Branch

"Kazan – Ulyanovsk" – Apastovo – Ulanovo – Karatun: 0+000 – 1+951 (Apastovo district)

Peg17+20-Peg18+14

Deconstruction of macadam base course on the drive way, strengthening of soil with lime, construction of sandy sub-base, construction of geogrid and base course of macadam-and-sand mix (C4 grade 400).

06/28/2024

Nizhnekamsky Branch

Gagarina Street (from Sportivnaya Street to Lesnaya Street): 0+000 – 2+345 (Nizhnekamsky district)

Milling of the asphaltic surface.

06/27/2024

Nizhnekamsky Branch

Mendeleyeva Street (from Suyumbike Street to Gagarina Street): 0+000 – 2+612 (Nizhnekamsky district)

Construction of leveling course of А16Нт mix.

06/27/2024

Menzelinsky Branch

"Aktanysh-Poisevo" – Bulyak: 5+100 – 9+920 (Aktanyshsky district)

Construction of road base course using cold recycling method.

06/26/2024

Apastovsky Branch

"Kazan – Ulyanovsk" – Staroye Baryshevo – Kamskoye Ustye: 15+8782 – 16+782 (Kamsko-Ustyinsky district)

Construction of leveling asphalt-concrete course is finished.

06/26/2024

Apastovsky Branch

Access road to Kirova settlement:0+000 – 1+055 (Verkhneuslonsky district)

Works are finished on site.

06/26/2024

Aksubaevsky Branch

Chistopol – Aksubayevo – Nurlat: 47+170 – 48+480 (Aksubayevsky district)

Works are finished on site.

06/25/2024

Apastovsky Branch

Krasnovidovo – Siukeyevo: 3+840 – 9+000 (Kamsko-Ustyinsky district)

Stabilization of soil with lime.

06/25/2024

Apastovsky Branch

"Bolshiye Kaibitsy – Kamylovo" – Nadezhdino – Kichkeyevo: 0+000 – 2+462 (Kaibitsky district)

Construction of macadam-and-sand surface course (macadam grade 800).

06/25/2024

Mamadyshsky Branch

M-7 Volga (Federal auto roads)

Construction of stone mastics layers (grade 20).

06/25/2024

Mamadyshsky Branch

Mamadysh – Kukmor: 28+923 – 30+729 (Mamadyshsky district)

Workers of JSC "Tatavtodor" conduct ground works.

06/25/2024

Аrsky Branch

Ashitbash – Shushmabash – Karaduvan: 22+900 - 24+800 (Arsky district)

Construction of 0.04 m thick surface course with stone mastics (grade 8).

06/21/2024

Mamadyshsky Branch

Malaya Shilna – Bolshaya Shilna: 0+000 – 3+060 (Tukayevsky district)

Milling of asphalted surface.

06/21/2024

Mamadyshsky Branch

M-7 Volga (Federal auto roads district)

Milling of asphalt-concrete surface.

06/15/2024

Menzelinsky Branch

“Aktanysh – Poisevo” – Bulyak: 5+100 – 9+920 (Aktanyshsky district)

Planning of road base course.

06/13/2024

Apastovsky Branch

Road maintenance on local roads in Verkhneuslonsky district of the Republic of Tatarstan (Verkhneuslonsky district)

Worn out asphaltic layers (part km 1+800 – km 2+200, 2400 sq.m. in total) reconstructed on M-7 “Volga” – Kayinky auto road.

06/10/2024

Apastovsky Branch

P-241 Kazan – Ulyanovsk (Federal auto roads district)

Strengthening of roadsides is finished here. 

06/10/2024

Apastovsky Branch

Road maintenance on local roads in Kaibitsky district of the Republic of Tatarstan (Kaibitsky district)

Workers of JSC “Tatavtodor” conduct reconstruction of worn-our layers on “Bolshiye kaibitsy – Bagayevo” – Saltyganovo auto road. 

06/10/2024

Nizhnekamsky Branch

Mira Avenue (from Vakhitova Avenue to Stroiteley Avenue): 0+000 - 1+986 (Nizhnekamsky district)

Workers of JSC “Tatavtodor” conduct construction of asphalted surface course with stone mastics (grade 16).

06/09/2024

Suburban Branch

Road maintenance on local roads in Pestrechinsky district of the Republic of Tatarstan (Pestrechinsky district)

Construction of surface course with stone mastics (grade 8).

06/09/2024

Apastovsky Branch

Road maintenance on local roads in Kamsko-Ustyinsky district of the Republic of Tatarstan (Kamsko-Ustyinsky district)

Summer auto road maintenance works.

06/09/2024

Apastovsky Branch

Access road to Kirov settlement: 0+000 - 1+055 (Verkhneuslonsky district)

Construction of black macadam levelling course.

Construction of levelling course with А16Нн asphalt-concrete mix.

Construction of surface course with stone mastics (grade 8).

06/09/2024

Apastovsky Branch

Karatun – Cheremshan – Bolshoye Podberezye: 9+700 - 10+500 (Apastovsky district)

Construction of surface course with stone mastics asphalt-concrete mix (grade 8) and roadsides strengthening is finished.

06/08/2024

Suburban Branch

M-7 Volga (Federal auto roads district)

Milling of asphalt-concrete surface.

06/08/2024

Apastovsky Branch

Road maintenance on local roads in Apastovsky district of the Republic of Tatarstan (Apastovsky district)

Summer auto road maintenance.

06/08/2024

Menzelinsky Branch

Reconstruction of the auto road in Arnyakovo settlement: 0+000 - 0+539; 0+000 - 1+401 (Aktanyshsky district)

Construction of base course of asphalted surface.

06/07/2024

Apastovsky Branch

P-241 Kazan – Ulyanovsk (Federal auto roads district)

Mowing of the grass from the slopes and roadsides.

06/07/2024

Menzelinsky Branch

Road maintenance on local roads in Aktanyshsky district of the Republic of Tatarstan (Aktanyshsky district)

Pothole repair on the asphalted auto road.

06/07/2024

Apastovsky Branch

Apastovo – Tetiushy: 14+912 - 15+969 (Tetiushsky district)

Construction of levelling course of asphalted surface.

06/07/2024

Apastovsky Branch

Krasnovidovo – Siukeyevo: 3+840 - 9+000 (Kamsko–Ustyinsky district)

Construction of corrugated pipe.

06/07/2024

Buinsky Branch

Staroye Drozhzhanoye – Karakitan:  5+500 - 6+500 (Drozhzhanovsky district)

Construction of surface course with stone mastics (grade 8).

06/07/2024

Buinsky Branch

Road maintenance on local roads in Buinsky district of the Republic of Tatarstan (Buinsky district)

Mechanical mowing on the roadsides.

06/07/2024

Suburban Branch

Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 - 2+980 (Laishevsky district)

Construction of the auto road base course using cold recycling method with recycler machine, with addition of water, enriched sand-and-gravel mix, and Portland cement.

06/01/2024

Sabinsky Branch

“Arsk – Siza” – Alan: 0+000 – 6+860 (Arsky district)

Construction of base course with macadam-and-sand mix, construction of asphalt-concrete surface course.

06/01/2024

Menzelinsky Branch

Aktanysh – Poisevo:  22+090 - 25+892 (Aktanyshsky district)

Bank slopes planning.

Construction of auto road base course with macadam.

Construction of auto road base course using cold recycling method.

Construction of sub-base.

06/01/2024

Menzelinsky Branch

“Aktanysh – Poisevo” - Bulyak:  16+020 - 17+420 (Aktanyshsky district)

 Construction of levelling course, strengthening of slopes with macadam.

06/01/2024

Mamadyshsky Branch

Mamadysh – Tiulyachi: 2+290 – 3+580 (Mamadyshsky district)

Construction of levelling and surface course of the auto road, strengthening of slopes with macadam.

05/31/2024

Suburban Branch

Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 - 2+980 (Laishevsky district)

Construction of earth roadbed. Construction of levelling course with enriched macadam-and-sand mix.

05/30/2024

Mamadyshsky Branch

Mamadysh – Kukmor: 28+923 - 30+729 (Mamadyshsky district)

Construction of bypass road, milling of asphalted road surface

05/30/2024

Suburban Branch

Stolbische – Atabayevo: 2+050 - 3+830 (Laishevsky district)

Application of horizontal paint marking.

05/29/2024

Аrsky Branch

Bolshaya Atnya – Chepchugy: 7+455 - 9+608 (Atninsky district)

Construction of earth roadbed.

05/29/2024

Аrsky Branch

Ashitbash – Shushmabash – Karaduvan: 22+900 - 24+800 (Arsky district)

Construction of levelling course using А16Нн mix.

05/28/2024

Menzelinsky Branch

Local road maintenance in Aktanyshsky district of the Republic of Tatarstan (Aktanyshsky district)

Mowing of the grass with tractor-mounted mower.

05/28/2024

Аrsky Branch

Bolshaya Atnya – Chepchugy: 7+455 - 9+608 (Atninsky district)

Milling of asphalted surface (average thickness 0.10 m) and loading the removed layer into the loader trucks.

05/28/2024

Apastovsky Branch

“Bolshiye Kaibitsy – Kamylovo” – Nadezhdino – Kichkeyevo: 0+000 - 2+462 (Kaibitsky district)

Workers of JSC “Tatavtodor” conduct ground works.

05/27/2024

Apastovsky Branch

Access road to Kirova settlement: 0+000 - 1+055 (Verkhneuslonsky district)

Widening of the base course according to the construction plan is finished. Installation of corrugated pipe and construction of access tracks is finished. 

05/26/2024

Apastovsky Branch

“Bolshiye Kaibitsy – Kamylovo” – Bolshoye Tyaberdino: 3+675 - 4+535 (Kaibitsky district)

Construction of levelling course of asphalt-concrete А16Нн mix and surface course of stone mastics (grade 8) is finished.

05/25/2024

Aksubaevsky Branch

Chistopol – Aksubayevo – Nurlat: 47+170 - 48+480 (Aksubayevsky district)

Construction of surface course of stone mastics (grade 8).

05/24/2024

Apastovsky Branch

Krasnovidovo – Siukeyevo: 3+840 - 9+000 (Kamsko – Ustyinsky district)

Workers of JSC “Tatavtodor” conduct installation of corrugated pipe.

05/23/2024

Suburban Branch

Kamenka – Dubyazy – Bolshaya Atnya: 13+800 - 15+100 (Vysokogorsky district)

Construction of surface course with stone mastics (grade 8).

05/23/2024

Nizhnekamsky Branch

Vakhitov Avenue (from Khimikov Avenue to Mira Avenue): 0+000 - 1+056 (Nizhnekamsky district)

Construction of surface course with stone mastics (grade 16).

05/23/2024

Apastovsky Branch

“Bolshiye Kaibitsy – Kamylovo” – Nadezhdino – Kichkeyevo: 0+000 - 2+462 (Kaibitsky district)

Workers of JSC “Tatavtodor” conduct ground works and installation of corrugated pipe.

05/23/2024

Apastovsky Branch

Karatun – Cheremshan – Bolshoye Podberezye: 9+700 - 10+500 (Apastovsky district)

Construction of levelling course using asphalt-concrete and black macadam mix.

Construction of levelling course using asphalt-concrete А16Нн mix.

05/22/2024

Apastovsky Branch

Kazan – Ulyanovsk (Federal auto roads)

Milling of asphalted surface, reconstruction of worn-out layers with stone mastics (grade 15), and strengthening of roadsides on “Kazan – Buinsk – Ulyanovsk” auto road are finished.

05/21/2024

Аrsky Branch

Local road maintenance in Arsky district of the Republic of Tatarstan (Arsky district)

Summer road maintenance.

05/18/2024

Sabinsky Branch

Baltasy – Shemordan:  23+950 - 25+660 (Kukmorsky district)

Construction of 4 cm thick surface layer of asphalted road with stone mastics (grade 8).

05/17/2024

Menzelinsky Branch

Musliumovo – Staroye Saitovo:  16+000 - 18+200 (Musliumovsky district)

Construction of levelling and surface courses of the auto road.

05/14/2024

Menzelinsky Branch

Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)

Auto road reconstruction: First pass of the recycler.

05/14/2024

Buinsky Branch

Buinsk – Yalchiki: 0+580 - 2+080 (Buinsky district)

Milling of asphaltic surface of the auto road.

05/06/2024

Apastovsky Branch

05/06/2024

Apastovsky Branch

Karatun – Cheremshan – Bolshoye Podberezye: 9+700 - 10+500 (Apastovsky district)

Milling of asphaltic surface of the auto road.

05/06/2024

Menzelinsky Branch

Local road maintenance in Menzelinsky district of the Republic of Tatarstan (Menzelinsky district) 
Reconstruction of worn-out surface layers.

05/03/2024

Suburban Branch

Р-239 Kazan – Orenburg (Federal auto roads)

Pothole repair using hot asphaltic mix in Laishevsky municipal district of the Republic of Tatarstan.

05/02/2024

Suburban Branch

Stolbische – Atabayevo: 2+050 - 3+830 (Laishevsky district)

Construction of levelling course with А16Нт asphaltic mix.