Chronicle of Work10/09/2024 Аrsky Branch 10/08/2024 Аrsky Branch 10/08/2024 Menzelinsky Branch 10/04/2024 Suburban Branch 10/03/2024 Аrsky Branch 10/03/2024 Suburban Branch 09/30/2024 Menzelinsky Branch 09/27/2024 Menzelinsky Branch 09/26/2024 Menzelinsky Branch 09/25/2024 Menzelinsky Branch 09/25/2024 Menzelinsky Branch 09/24/2024 Аrsky Branch 09/23/2024 Аrsky Branch 09/23/2024 Suburban Branch 09/23/2024 Suburban Branch 09/18/2024 Buinsky Branch 09/18/2024 Buinsky Branch 09/18/2024 Buinsky Branch 09/18/2024 Buinsky Branch 09/17/2024 Menzelinsky Branch 09/17/2024 Menzelinsky Branch 09/17/2024 Menzelinsky Branch 09/16/2024 Аrsky Branch 09/14/2024 Aksubaevsky Branch 09/12/2024 Suburban Branch 09/11/2024 Aksubaevsky Branch 09/10/2024 Аrsky Branch 09/06/2024 Suburban Branch "Kazan – Borovoye Matiushino” – Peschanye Kovaly – “Stolbistche – Atabayevo”: 2+500 - 3+100 (Laishevsky district) Milling of the asphalt-concrete surface. 09/05/2024 Suburban Branch Kamenka – Dubyazy – Bolshaya Atnya: 2+581 - 2+731 (Vysokogorsky district)
Horizontal road marking. 09/04/2024 Аrsky Branch Bolshaya Atnya – Chepchiugy: 7+455 – 9+608 (Atninsky district)
Construction of 4 cm thick surface layer with stone mastics (grade 8). 09/04/2024 Аrsky Branch Kazan – Shemordan: 64+396 - 64+975; 84+830 - 85+285 (Tiulyachinsky district)
Works are finished. 09/03/2024 Apastovsky Branch
Road network, roads with macadam-and-sand mix (Apastovsky district) 2024: 0+000 - 0+150; 0+000 - 0+432; 0+000 - 0+200; 0+000 - 0+432; 0+000 - 0+200 (Apastovsky district) 09/03/2024 Аrsky Branch Kurkachi – Verkhnyaay Iya: 3+000 - 5+500 (Vysokogorsky district)
Construction of sandy subbase 20 cm thick. 08/29/2024 Apastovsky Branch Krasnovidovo – Siukeyevo: 5+935 - 9+000 (Kamsko-Ustyinsky district)
Construction of surface layer with stone mastics (grade 8). 08/29/2024 Apastovsky Branch Local road maintenance in Kamsko-Ustyinsky district of the Republic of Tatarstan (Kamsko-Ustyinsky district)
Reconstruction of auto roads is finished. 08/27/2024 Suburban Branch Stolbistche – Atabayevo: 6+964 - 7+326 (Laishevsky district)
Construction of surface layer with stone mastics (grade 8). 08/27/2024 Sabinsky Branch Access road to Malaya Chura settlement: 0+000 - 1+910 (Kukmorsky district)
Construction of 2 cm thick surface layer with stone mastics (grade 5). 08/26/2024 Menzelinsky Branch
Access road to “Bulyak” municipal educational centre: 0+000 - 0+206 (Aktanyshsky district) 08/23/2024 Apastovsky Branch “Kazan – Ulyanovsk” – Kamskoye Ustye: 0+000 - 2+930 (Verkhneuslonsky district)
Construction of surface layer with stone mastics (grade 8) is finished. 08/23/2024 Suburban Branch Kazan – Shemordan: 21+977 - 22+777 (Pestrechinsky district)
Construction of surface layer with stone mastics (grade 20). 08/23/2024 Аrsky Branch Ashitbash – Shushmabash – Karaduvan: 22+900 - 24+800 (Arsky district)
Works are finished. 08/22/2024 Apastovsky Branch Road network, asphalted roads (Apastovsky district) 2024: 0+000 - 0+290; 0+000 - 0+307; 0+000 - 0+150 (Apastovsky district)
Works are finished. 08/22/2024 Аrsky Branch Kazan – Shemordan: 64+396 - 64+975; 84+830 - 85+285 (Tiulyachinsky district)
Strengthening of slopes with 10 cm thick granular asphalt. 08/22/2024 Аrsky Branch Bolshaya Atnya – Chepchiugy: 7+455 – 9+608 (Atninsky district)
Construction of 4 cm thick surface layer with stone mastics (grade 8). 08/22/2024 Аrsky Branch “Arsk - Bolshaya Atnya” - Koshlauch: 2+945 - 4+431 (Arsky district)
Construction of levelling course with А32Он asphalt-concrete mix. 08/20/2024 Mamadyshsky Branch Mamadysh – Kukmor: 28+923 - 30+729 (Mamadyshsky district)
Laying of asphalt-concrete surface course. 08/20/2024 Mamadyshsky Branch Local road maintenance in Mamadyshsky district of the Republic of Tatarstan (Mamadyshsky district)
Pothole patching on the auto roads. 08/20/2024 Mamadyshsky Branch M-7 “Volga” – Mamadysh: 0+000 - 0+506; 0+806 - 3+515 (Mamadyshsky district)
Workers of our company conduct construction works. 08/20/2024 Suburban Branch Rybnaya Sloboda – Yanchikovo: 6+258 - 8+058 (Rybno-Slobodsky district)
Horizontal road marking. 08/20/2024 Suburban Branch M-7 “Volga” (Federal auto roads)
Summer road maintenance. 08/20/2024 Suburban Branch Local road maintenance in Vysokogorsky district of the Republic of Tatarstan (Vysokogorsky district)
Summer road maintenance. 08/19/2024 Menzelinsky Branch Road network in Mellya-Tamak settlement: 0+000 - 1+233; 0+000 - 0+860; 0+000 - 0+927 (Musliumovsky district)
Construction of asphalt-concrete road surface. 08/15/2024 Menzelinsky Branch “Aktanysh – Poisevo” – Bulyak: 5+100 - 9+920 (Aktanyshsky district)
Construction of macadam-and-sand subbase. 08/15/2024 Mamadyshsky Branch M-7 “Volga” – Mamadysh: 0+000 - 0+506; 0+806 - 3+515 (Mamadyshsky district)
Milling of auto road surface. 08/15/2024 Sabinsky Branch Access road to Malaya Chura settlement: 0+000 - 1+910 (Kukmorsky district)
Construction of base course of the asphaltic road surface. 08/13/2024 Suburban Branch Local road maintenance in Rybno-Slobodsky district of the Republic of Tatarstan (Rybno-Slobodsky district)
Installation of metal barriers. 08/12/2024 Suburban Branch
Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 - 2+980 (Laishevsky district) 08/09/2024 Sabinsky Branch Chita – Kryash-Serda: 0+000 - 2+200 (Pestrechinsky district) Workers of our company conduct construction of surface layer with stone mastics (grade 8). 08/08/2024 Menzelinsky Branch Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district) Strengthening of roadsides with macadam. 08/07/2024 Suburban Branch Stolbische – Atabayevo: 6+964 - 7+326 (Laishevsky district)
Construction of base course of the auto road with А32Нт asphalt-concrete mix. 08/07/2024 Menzelinsky Branch Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)
Construction of surface layer with stone mastics (grade 8). 08/03/2024 Sabinsky Branch Ash-Buzy – Mamashire: 4+203 - 8+213 (Kukmorsky district)
Construction of base course of the asphalt-concrete auto road. 08/02/2024 Аrsky Branch Access road to Tiulyachy district center: 2+845 - 3+299; 3+665 - 5+395 (Tiulyachinsky district)
Milling of asphalted surface to the depth of 0.10 m. 08/02/2024 Аrsky Branch Bolshaya Atnya – Chepchugy: 7+455 - 9+608 (Atninsky district)
Construction of 7 cm thick base course with А32Нн asphalt-concrete mix. 08/02/2024 Suburban Branch Stolbische – Atabayevo: 6+964 - 7+326 (Laishevsky district)
Construction of roadbed with С-4 М-800 macadam-and-sand mix. 08/01/2024 Suburban Branch Rybnaya Sloboda – Yanchikovo: 6+258 - 8+058 (Rybno-Slobodsky district)
Strengthening of roadsides with M-400 macadam. 07/31/2024 Menzelinsky Branch Menzelinsk – Russkiy Karan – Togashevo: 14+645 - 20+013 (Menzelinsky district)
Construction of road base course using cold recycling method. 07/31/2024 Menzelinsky Branch “M-7 “Volga” – Konovalovka” – Staraya Ashpala: 2+860 - 4+627; 0+000 - 0+500; 0+000 - 0+134 (Menzelinsky district)
Construction of auto road subbase. 07/30/2024 Suburban Branch Kazan – Shemordan: 21+977 - 22+777 (Pestrechinsky district)
Construction of roadbed with С-4 М-800 macadam-and-sand mix on the access ramp. 07/29/2024 Aksubaevsky Branch Kuzaykino – Nurlat: 41+057 - 42+207; 46+070 - 49+939 (Cheremshansky district)
Workers of JSC “Tatavtodor” conduct construction works. 07/29/2024 Suburban Branch Stolbische – Atabayevo: 6+964 - 7+326 (Laishevsky district)
Construction of earth roadbed. 07/26/2024 Suburban Branch Kamenka – Dubyazy – Bolshaya Atnya: 2+581 - 2+731 (Vysokogorsky district)
Construction of roadbed with С-4 М-800 macadam-and-sand mix. 07/26/2024 Suburban Branch P-239 Kazan – Orenburg, access road to Kazan Airport (Federal auto roads)
Cleaning of the driveway with vacuum sweeping machine. 07/26/2024 Nizhnekamsky Branch Road junction on “Chistopol – Nizhnekamsk” auto road: 0+000 - 3+880 (Nizhnekamsky district)
Construction of asphalted surface course with stone mastics (grade 16). 07/25/2024 Mamadyshsky Branch Malaya Shilna – Bolshaya Shilna: 0+000 - 3+060 (Tukayevsky district)
Construction of surfacing layer with black macadam. 07/25/2024 Mamadyshsky Branch Mamadysh – Kukmor: 28+923 - 30+729 (Mamadyshsky district) Stabilization of earth bed and construction of road surfacing. 07/24/2024 Mamadyshsky Branch Maintenance works on local roads in Mamadyshsky district of the Republic of Tatarstan (Mamadyshsky district)
Summer road maintenance. 07/23/2024 Menzelinsky Branch
“M-7 “Volga” – Konovalovka” – Staraya Ashpala: 0+000 - 2+860 (Menzelinsky district) Soil liming.
07/23/2024 Menzelinsky Branch Menzelinsk – Russkiy Karan – Togashevo: 14+645 - 20+013 (Menzelinsky district)
Construction of road base course using cold recycling method. 07/22/2024 Suburban Branch Stolbische – Atabayevo: 6+964 - 7+326 (Laishevsky district)
Stabilization of soil with lime. 07/22/2024 Suburban Branch Kamenka – Dubyazy – Bolshaya Atnya: 2+581 - 2+731 (Vysokogorsky district)
Stabilization of soil with lime. 07/22/2024 Menzelinsky Branch Maintenance works on local roads in Aktanyshsky district of the Republic of Tatarstan (Aktanyshsky district)
Mowing of the grass with tractor-mounted mower. 07/22/2024 Suburban Branch Maintenance works on local roads in Rybno-Slobodsky district of the Republic of Tatarstan (Rybno-Slobodsky district)
Strengthening of roadsides is finished. 07/19/2024 Аrsky Branch “Kazan – Shemordan” - Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)
Construction of leveling course with А16Нн asphalt-concrete mix. 07/19/2024 Buinsky Branch Access road to Koshki-Novotimbayevo settlement: 0+000 - 0+855 (Tetiushsky district)
Workers of our company conduct construction of roadbed with macadam-and-sand mix. 07/19/2024 Buinsky Branch “Buinsk – Yalchiki” – Isakovo: 6+274 - 8+445 (Buinsky district)
Stabilization of soil with cement. 07/18/2024 Аrsky Branch “Kazan – Shemordan” - Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)
Construction of 0.07 m thick base course with А22Нн asphalt-concrete mix. 07/18/2024 Menzelinsky Branch Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)
Construction of bus stations for bus stop pavilions. 07/18/2024 Menzelinsky Branch “M-7 “Volga” – Konovalovka” – Staraya Ashpala: 0+000 - 2+860 (Menzelinsky district) Preparation of base with sand-and-gravel mix, emulsion pouring. 07/18/2024 Suburban Branch Maintenance works on local roads in Rybno-Slobodsky district of the Republic of Tatarstan (Rybno-Slobodsky district)
Mowing of the grass on roadsides and slopes. 07/17/2024 Suburban Branch Maintenance works on local roads in Vysokogorsky district of the Republic of Tatarstan (Vysokogorsky district)
Reconstruction of worn-out layers of asphaltic surface on the “Bypass of Aldermysh settlement” auto road. 07/17/2024 Suburban Branch P-239 Kazan – Orenburg (Federal auto roads)
Summer road maintenance. 07/17/2024 Аrsky Branch Kazan – Shemordan: 64+396 - 64+975; 84+830 - 85+285 (Tiulyachinsky district)
Construction of surface layer with stone mastics (grade 8, 0.04 m thick). 07/17/2024 Аrsky Branch “Kazan – Shemordan” - Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)
Construction of 0.20 m thick roadbed with М-400 macadam. 07/16/2024 Аrsky Branch Kazan – Shemordan: 64+396 - 64+975; 84+830 - 85+285 (Tiulyachinsky district)
Milling of the asphalted surface.
Construction of leveling course of А16Нт mix. 07/16/2024 Аrsky Branch Kurkachi – Verkhnyaya Iya: 3+000 – 5+500 (Vysokogorsky district)
Construction of the ground base course stabilized with lime. 07/16/2024 Аrsky Branch "Kazan – Shemordan" – Lesnoy: 9+790 - 13+275 (Tiulyachinsky district)
Construction of the additional base course with sand, 0.20 m thick. 07/13/2024 Menzelinsky Branch Musliumovo – Staroye Saitovo: 16+000 – 18+200 (Musliumovsky district)
Works are finished. 07/12/2024 Sabinsky Branch Chita – Kryash-Serda: 0+000 – 2+200 (Pestrechinsky district)
Construction of base course using cold regeneration method. 07/12/2024 Buinsky Branch Access road to settlement Koshky – Novotimbayevo: 0+000 – 0+855 (Tetiushsky district)
Stabilization of soil with lime. 07/10/2024 Buinsky Branch Staroye Drozhzhanoye – Tatarskiye Shatrashany – Gorodische: 5+000 – 7+000 (Drozhzhanovsky district)
Stabilization of soil with cement and construction of macadam-and-sand base course. 07/09/2024 Apastovsky Branch "Kazan – Ulyanovsk" – Apastovo – Ulanovo – Karatun: 0+000 – 1+951 (Apastovsky district)
Deconstruction of macadam base course on the drive way, strengthening of soil with cement, construction of sandy sub-base, construction of geogrid and base course of macadam-and-sand mix. 07/09/2024 Apastovsky Branch "Kazan – Ulyanovsk" – Kamskoye Ustye: 0+000 – 2+930 (Verkhneuslonsky district)
Milling of asphalted surface is finished. 07/05/2024 Apastovsky Branch "Kazan – Ulyanovsk" – Apastovo – Ulanovo – Karatun: 0+000 – 1+951 (Apastovsky district)
Peg 0+00-peg 7+51, peg 9+60-peg 17+25, peg 18+14-peg19+50.
Regeneration of asphalted surface with addition of macadam is finished. 07/05/2024 Buinsky Branch "Buinsk – Yalchiki" – Isakovo: 6+274 – 8+445 (Buinsky district)
Construction of earth road bed. 07/05/2024 Suburban Branch Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 – 2+980 (Laishevsky district)
Construction of base course of C4 macadam-and-sand mix (grade 800). 07/05/2024 Aksubaevsky Branch Alekseyevskoye – Almetyevsk: 51+500 – 61+400 (Aksubayevsky district)
Construction of surface course of SMA-16. 07/04/2024 Suburban Branch Kamenka – Dubyazy – Boslshaya Atnya: 13+800 – 15+100 (Vysokogorsky district)
Works are finished on site. 07/03/2024 Nizhnekamsky Branch Traffic interchange on "Chistopol – Nizhnekamsk" auto road: 0+000 – 3+880 (Nizhnekamsky district)
Construction if surface course with А32ОТ asphalt-concrete mix. 07/03/2024 Suburban Branch Local roads maintenance in Laishevsky district of the Republic of Tatarstan (Laishevsky district)
Summer road maintenance. 07/03/2024 Suburban Branch M-7 Volga (Federal auto roads)
Access road to Kirov city. Mowing of the grass on roadsides and slopes. 07/01/2024 Apastovsky Branch "Kazan – Ulyanovsk" – Apastovo – Ulanovo – Karatun: 0+000 – 1+951 (Apastovo district)
Peg17+20-Peg18+14
Deconstruction of macadam base course on the drive way, strengthening of soil with lime, construction of sandy sub-base, construction of geogrid and base course of macadam-and-sand mix (C4 grade 400). 06/28/2024 Nizhnekamsky Branch Gagarina Street (from Sportivnaya Street to Lesnaya Street): 0+000 – 2+345 (Nizhnekamsky district)
Milling of the asphaltic surface. 06/27/2024 Nizhnekamsky Branch Mendeleyeva Street (from Suyumbike Street to Gagarina Street): 0+000 – 2+612 (Nizhnekamsky district)
Construction of leveling course of А16Нт mix. 06/27/2024 Menzelinsky Branch "Aktanysh-Poisevo" – Bulyak: 5+100 – 9+920 (Aktanyshsky district)
Construction of road base course using cold recycling method. 06/26/2024 Apastovsky Branch "Kazan – Ulyanovsk" – Staroye Baryshevo – Kamskoye Ustye: 15+8782 – 16+782 (Kamsko-Ustyinsky district)
Construction of leveling asphalt-concrete course is finished. 06/26/2024 Apastovsky Branch Access road to Kirova settlement:0+000 – 1+055 (Verkhneuslonsky district)
Works are finished on site. 06/26/2024 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: 47+170 – 48+480 (Aksubayevsky district)
Works are finished on site. 06/25/2024 Apastovsky Branch Krasnovidovo – Siukeyevo: 3+840 – 9+000 (Kamsko-Ustyinsky district)
Stabilization of soil with lime. 06/25/2024 Apastovsky Branch "Bolshiye Kaibitsy – Kamylovo" – Nadezhdino – Kichkeyevo: 0+000 – 2+462 (Kaibitsky district)
Construction of macadam-and-sand surface course (macadam grade 800). 06/25/2024 Mamadyshsky Branch M-7 Volga (Federal auto roads)
Construction of stone mastics layers (grade 20). 06/25/2024 Mamadyshsky Branch Mamadysh – Kukmor: 28+923 – 30+729 (Mamadyshsky district)
Workers of JSC "Tatavtodor" conduct ground works. 06/25/2024 Аrsky Branch Ashitbash – Shushmabash – Karaduvan: 22+900 - 24+800 (Arsky district)
Construction of 0.04 m thick surface course with stone mastics (grade 8). 06/21/2024 Mamadyshsky Branch Malaya Shilna – Bolshaya Shilna: 0+000 – 3+060 (Tukayevsky district)
Milling of asphalted surface. 06/21/2024 Mamadyshsky Branch M-7 Volga (Federal auto roads district)
Milling of asphalt-concrete surface. 06/15/2024 Menzelinsky Branch “Aktanysh – Poisevo” – Bulyak: 5+100 – 9+920 (Aktanyshsky district)
Planning of road base course. 06/13/2024 Apastovsky Branch Road maintenance on local roads in Verkhneuslonsky district of the Republic of Tatarstan (Verkhneuslonsky district)
Worn out asphaltic layers (part km 1+800 – km 2+200, 2400 sq.m. in total) reconstructed on M-7 “Volga” – Kayinky auto road. 06/10/2024 Apastovsky Branch P-241 Kazan – Ulyanovsk (Federal auto roads district)
Strengthening of roadsides is finished here. 06/10/2024 Apastovsky Branch Road maintenance on local roads in Kaibitsky district of the Republic of Tatarstan (Kaibitsky district)
Workers of JSC “Tatavtodor” conduct reconstruction of worn-our layers on “Bolshiye kaibitsy – Bagayevo” – Saltyganovo auto road. 06/10/2024 Nizhnekamsky Branch Mira Avenue (from Vakhitova Avenue to Stroiteley Avenue): 0+000 - 1+986 (Nizhnekamsky district)
Workers of JSC “Tatavtodor” conduct construction of asphalted surface course with stone mastics (grade 16). 06/09/2024 Suburban Branch Road maintenance on local roads in Pestrechinsky district of the Republic of Tatarstan (Pestrechinsky district)
Construction of surface course with stone mastics (grade 8). 06/09/2024 Apastovsky Branch Road maintenance on local roads in Kamsko-Ustyinsky district of the Republic of Tatarstan (Kamsko-Ustyinsky district)
Summer auto road maintenance works. 06/09/2024 Apastovsky Branch Access road to Kirov settlement: 0+000 - 1+055 (Verkhneuslonsky district)
Construction of black macadam levelling course.
Construction of levelling course with А16Нн asphalt-concrete mix.
Construction of surface course with stone mastics (grade 8). 06/09/2024 Apastovsky Branch Karatun – Cheremshan – Bolshoye Podberezye: 9+700 - 10+500 (Apastovsky district)
Construction of surface course with stone mastics asphalt-concrete mix (grade 8) and roadsides strengthening is finished. 06/08/2024 Suburban Branch M-7 Volga (Federal auto roads district)
Milling of asphalt-concrete surface. 06/08/2024 Apastovsky Branch Road maintenance on local roads in Apastovsky district of the Republic of Tatarstan (Apastovsky district)
Summer auto road maintenance. 06/08/2024 Menzelinsky Branch Reconstruction of the auto road in Arnyakovo settlement: 0+000 - 0+539; 0+000 - 1+401 (Aktanyshsky district)
Construction of base course of asphalted surface. 06/07/2024 Apastovsky Branch P-241 Kazan – Ulyanovsk (Federal auto roads district)
Mowing of the grass from the slopes and roadsides. 06/07/2024 Menzelinsky Branch Road maintenance on local roads in Aktanyshsky district of the Republic of Tatarstan (Aktanyshsky district)
Pothole repair on the asphalted auto road. 06/07/2024 Apastovsky Branch Apastovo – Tetiushy: 14+912 - 15+969 (Tetiushsky district)
Construction of levelling course of asphalted surface. 06/07/2024 Apastovsky Branch Krasnovidovo – Siukeyevo: 3+840 - 9+000 (Kamsko–Ustyinsky district)
Construction of corrugated pipe. 06/07/2024 Buinsky Branch Staroye Drozhzhanoye – Karakitan: 5+500 - 6+500 (Drozhzhanovsky district)
Construction of surface course with stone mastics (grade 8). 06/07/2024 Buinsky Branch Road maintenance on local roads in Buinsky district of the Republic of Tatarstan (Buinsky district)
Mechanical mowing on the roadsides. 06/07/2024 Suburban Branch Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 - 2+980 (Laishevsky district)
Construction of the auto road base course using cold recycling method with recycler machine, with addition of water, enriched sand-and-gravel mix, and Portland cement. 06/01/2024 Sabinsky Branch “Arsk – Siza” – Alan: 0+000 – 6+860 (Arsky district)
Construction of base course with macadam-and-sand mix, construction of asphalt-concrete surface course. 06/01/2024 Menzelinsky Branch Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)
Bank slopes planning.
Construction of auto road base course with macadam.
Construction of auto road base course using cold recycling method.
Construction of sub-base. 06/01/2024 Menzelinsky Branch “Aktanysh – Poisevo” - Bulyak: 16+020 - 17+420 (Aktanyshsky district)
Construction of levelling course, strengthening of slopes with macadam. 06/01/2024 Mamadyshsky Branch Mamadysh – Tiulyachi: 2+290 – 3+580 (Mamadyshsky district)
Construction of levelling and surface course of the auto road, strengthening of slopes with macadam. 05/31/2024 Suburban Branch Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 - 2+980 (Laishevsky district)
Construction of earth roadbed. Construction of levelling course with enriched macadam-and-sand mix. 05/30/2024 Mamadyshsky Branch Mamadysh – Kukmor: 28+923 - 30+729 (Mamadyshsky district)
Construction of bypass road, milling of asphalted road surface 05/30/2024 Suburban Branch Stolbische – Atabayevo: 2+050 - 3+830 (Laishevsky district)
Application of horizontal paint marking. 05/29/2024 Аrsky Branch Bolshaya Atnya – Chepchugy: 7+455 - 9+608 (Atninsky district)
Construction of earth roadbed. 05/29/2024 Аrsky Branch Ashitbash – Shushmabash – Karaduvan: 22+900 - 24+800 (Arsky district)
Construction of levelling course using А16Нн mix. 05/28/2024 Menzelinsky Branch Local road maintenance in Aktanyshsky district of the Republic of Tatarstan (Aktanyshsky district)
Mowing of the grass with tractor-mounted mower. 05/28/2024 Аrsky Branch Bolshaya Atnya – Chepchugy: 7+455 - 9+608 (Atninsky district)
Milling of asphalted surface (average thickness 0.10 m) and loading the removed layer into the loader trucks. 05/28/2024 Apastovsky Branch “Bolshiye Kaibitsy – Kamylovo” – Nadezhdino – Kichkeyevo: 0+000 - 2+462 (Kaibitsky district)
Workers of JSC “Tatavtodor” conduct ground works. 05/27/2024 Apastovsky Branch Access road to Kirova settlement: 0+000 - 1+055 (Verkhneuslonsky district)
Widening of the base course according to the construction plan is finished. Installation of corrugated pipe and construction of access tracks is finished. 05/26/2024 Apastovsky Branch “Bolshiye Kaibitsy – Kamylovo” – Bolshoye Tyaberdino: 3+675 - 4+535 (Kaibitsky district)
Construction of levelling course of asphalt-concrete А16Нн mix and surface course of stone mastics (grade 8) is finished. 05/25/2024 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: 47+170 - 48+480 (Aksubayevsky district)
Construction of surface course of stone mastics (grade 8). 05/24/2024 Apastovsky Branch Krasnovidovo – Siukeyevo: 3+840 - 9+000 (Kamsko – Ustyinsky district)
Workers of JSC “Tatavtodor” conduct installation of corrugated pipe. 05/23/2024 Suburban Branch Kamenka – Dubyazy – Bolshaya Atnya: 13+800 - 15+100 (Vysokogorsky district)
Construction of surface course with stone mastics (grade 8). 05/23/2024 Nizhnekamsky Branch Vakhitov Avenue (from Khimikov Avenue to Mira Avenue): 0+000 - 1+056 (Nizhnekamsky district)
Construction of surface course with stone mastics (grade 16). 05/23/2024 Apastovsky Branch “Bolshiye Kaibitsy – Kamylovo” – Nadezhdino – Kichkeyevo: 0+000 - 2+462 (Kaibitsky district)
Workers of JSC “Tatavtodor” conduct ground works and installation of corrugated pipe. 05/23/2024 Apastovsky Branch Karatun – Cheremshan – Bolshoye Podberezye: 9+700 - 10+500 (Apastovsky district)
Construction of levelling course using asphalt-concrete and black macadam mix.
Construction of levelling course using asphalt-concrete А16Нн mix. 05/22/2024 Apastovsky Branch Kazan – Ulyanovsk (Federal auto roads)
Milling of asphalted surface, reconstruction of worn-out layers with stone mastics (grade 15), and strengthening of roadsides on “Kazan – Buinsk – Ulyanovsk” auto road are finished. 05/21/2024 Аrsky Branch Local road maintenance in Arsky district of the Republic of Tatarstan (Arsky district)
Summer road maintenance. 05/18/2024 Sabinsky Branch Baltasy – Shemordan: 23+950 - 25+660 (Kukmorsky district)
Construction of 4 cm thick surface layer of asphalted road with stone mastics (grade 8). 05/17/2024 Menzelinsky Branch Musliumovo – Staroye Saitovo: 16+000 - 18+200 (Musliumovsky district)
Construction of levelling and surface courses of the auto road. 05/14/2024 Menzelinsky Branch Aktanysh – Poisevo: 22+090 - 25+892 (Aktanyshsky district)
Auto road reconstruction: First pass of the recycler. 05/14/2024 Buinsky Branch Buinsk – Yalchiki: 0+580 - 2+080 (Buinsky district)
Milling of asphaltic surface of the auto road. 05/06/2024 Apastovsky Branch 05/06/2024 Apastovsky Branch Karatun – Cheremshan – Bolshoye Podberezye: 9+700 - 10+500 (Apastovsky district) 05/06/2024 Menzelinsky Branch
Local road maintenance in Menzelinsky district of the Republic of Tatarstan (Menzelinsky district) 05/03/2024 Suburban Branch Р-239 Kazan – Orenburg (Federal auto roads)
Pothole repair using hot asphaltic mix in Laishevsky municipal district of the Republic of Tatarstan. 05/02/2024 Suburban Branch Stolbische – Atabayevo: 2+050 - 3+830 (Laishevsky district)
Construction of levelling course with А16Нт asphaltic mix. |