May - July 2015

May - July 2015

07/30/2015

Menzelinsky Branch

The works are going on on site “Reconstruction of the auto road M-7 “Volga” – Staryi Irkenyash – Tatarskaya Mushuga, part Kzyl –Tiubyak – Yelga Bash in Menzelinsky district of the Republic of Tatarstan”.

07/29/2015

Aksubaevsky Branch

Construction of mass-type foundation for water pipes on site “Reconstruction of the auto road “Chistopol – Aksubayevo – Nurlat” – Kultura in Aksubayevsky municipal district of the Republic of Tatarstan.

07/29/2015

Aksubaevsky Branch

Construction of bottom layer of asphalt concrete is finished on site “Reconstruction of the auto road Drive to settlement Novoye Ilmovo in Cheremshansky district of the Republic of Tatarstan”.

07/29/2015

Menzelinsky Branch

Construction of reinforced concrete water pipes on site “Reconstruction of the auto road M-7 “Volga” – Novoye Aytmanovo – Atryakle-Kaltakovo-Filimonovka, part “M-7 “Volga – Staryi Irkenyash – Tatarskaya Mushuga – Kaltakovo in Menzelinsky municipal district of the Republic of Tatarstan.

07/28/2015

Menzelinsky Branch

Construction of asphalt-concrete bottom layer is finished on site “Reconstruction of the auto road Musliumovo – Staroye Saitovo, part Semyakovo – Staroye Saitovo in Musliumovsky district of the Republic of Tatarstan”.

07/25/2015

Аrsky Branch

Asphalt-concrete pavement had been laid on the auto road Arsk – Staryi Mui in Arsky district of the Republic of Tatarstan.

07/24/2015

Aksubaevsky Branch

Asphalt surface course construction is complete on site “Drive to brick-making plant in Cheremshansky district of the Republic of Tatarstan”.

07/24/2015

Asphalt surface course construction is being finished on site “Construction of the auto road “Tetiushi – Bolshiye tarkhany – Undory” – Sundiukovo” – Vozhzhi in Tetiushsky district of the Republic of Tatarstan”.

07/24/2015

Suburban Branch

Reconstruction of asphaltic surface on Kamaleyeva street from A. Kutuya street to N. Zhiganova street.

07/24/2015

Apastovsky Branch

The grass is being mowed off the slopes and roadsides of auto roads, and the slopes are being stabilized with macadam in Verkhneuslonsky district of the Republic of Tatarstan”.

07/24/2015

Menzelinsky Branch

Planning of gravel roads, mowing of grass off the slopes and roadsides is made by workers of Menzelinsky branch.

07/24/2015

Mamadyshsky Branch

Construction of asphalt bedding course on the auto road “Mamadysh – Kukmor” – Yamashevo in Mamadyshsky district of the Republic of Tatarstan”.

07/23/2015

Mamadyshsky Branch

Construction of pavement layers on the auto road M-7 “Volga” – Sokolka – Otarka in Mamadyshsky district of the Republic of Tatarstan”.

07/23/2015

Apastovsky Branch

Construction of asphalt-concrete pavement on site “Tetiushi – Kamskoye Ustiye, km 2+300 – 5+500 in Tetiushsky district of the Republic of Tatarstan”.

07/22/2015

Apastovsky Branch

Construction of bedding course and bottom layer is being finished on site “Reconstruction of the auto road “Kazan – Ulyanovsk” – Kamskoye Ustiye, km 61+450 – km 66+688 in Kamsko-Ustiynsky district of the Republic of Tatarstan”.

07/10/2015

Apastovsky Branch

Construction of earth bed on site “Drive to village Ulanovo in Verkhneuslonsky district of the Republic of Tatarstan”.

07/10/2015

Aksubaevsky Branch

Thin layer coating of macadam and mastics asphalt-concrete mix (ЩМАС-5 grade) 2 cm thick was applied on site “Normalization of route “Krivoozerki – Novaya Aleksandrovka – Nizhnyaya Balanda” in Aksubayevsky district of the Republic of Tatarstan”.

07/09/2015

Menzelinsky Branch

Earth bed stabilization with lime, construction of the road base bottom (sand and gravel mix+concrete) using “mix in place” method on site “Musliumovo – Staroye Saitovo, part Semyakovo – Staroye Saitovo in Musliumovsky district of the Republic of Tatarstan”.

07/08/2015

Workers of Drozhzhanovsky branch construct road bed and mount waterpipes on site “Reconstruction of the auto road Pochinok – Novo-Lyashevo – Tayba – Taushevo in Tetiushsky district of the Republic of Tatarstan”.

07/08/2015

Construction of asphalt bedding course on site “Construction of the auto road “Tetiushi – Bolshiye Tarkhany – Undory” - Siundiukovo” – Vozhzhi in Tetiushsky district of the Republic of Tatarstan”.

07/07/2015

Construction of subgrade upper layer made of high-porous asphalt-concrete on the auto road “Naberezhnye Chelny – Sarmanovo.

07/06/2015

Nizhnekamsky Branch

Construction of subsoil and macadam base on site “Reconstruction of the auto road “Chistopol – Nizhnekamsk”, part km 24+00 – km 26+00 with a bridge across Tolkishka river in Chistopolsky district of the Republic of Tatarstan”.

07/02/2015

Normalization of streets in settlement Staroye Drozhzhanoye.

07/02/2015

Aksubaevsky Branch

Construction of the bottom layer of the road surface on site “Normalization of the road “Krivoozerki – Novaya Aleksandrovka – Nizhnyaya Balanda” in Aksubayevsky municipal district of the Republic of Tatarstan”.

07/02/2015

Sabinsky Branch

Construction of the leveling course of macadam and sand mix M-600 and bottom layer of asphalt-concrete course on site “Reconstruction of the auto road “Bogatye Saby – Timershik – Verkhniy Simet – Alan” – Krenny, km 0+000 – km 4+280 in Sabinsky municipal district of the Republic of Tatarstan”.

07/01/2015

Mamadyshsky Branch

Lime stabilization of the ground on the earth bed on the auto road “Mamadysh – Kukmor – Yamashevo” in Mamdyshsky district of the Republic of Tatarstan” is finished.

07/01/2015

Suburban Branch

Reconstruction of asphalt-concrete course on A. Kutuya street in Kazan.

06/30/2015

Construction of the base course and macadam pavement base on site “Reconstruction of the auto road Naberezhnye Chelny – Sarmanovo, part km 6.5 – km 13 in Tukayevsky district of the Republic of Tatarstan”.

06/30/2015

Nizhnekamsky Branch

Construction of the base course on site “Reconstruction of the auto road Ishteryakovo – Nizhnekamsky production centre in Nizhnekamsky district of the Republic of Tatarstan” is finished.

06/29/2015

Menzelinsky Branch

Planning of the ground bed slopes is being made and strengthening of artificial constructions is being finished on site “Reconstruction of the auto road Verkhniy Tabyn – Togashevo in Musliumovsky district of the Republic of Tatarstan”.

06/27/2015

Menzelinsky Branch

Construction of corrugated culverts and sand-and-gravel bottoming, stabilization of the earth bed with lime on site “Reconstruction of the auto road “Musliumovo – Staroye Saitovo”, part Semeakovo-Sataroye Saitovo in Musliumovsky district of the Republic of Tatarstan”.

06/26/2015

Apastovsky Branch

Reinforced concrete pipes are being constructed on site “Reconstruction of the auto road Drive to village Ulanovo in Verkhneuslonsky district of the Republic of Tatarstan”.

06/26/2015

Apastovsky Branch

Construction works on site “Reconstruction of the auto road Kazan – Ulyanovsk – Kamskoye Ustye, km 15+200 in Verkhneuslonsky district of the Republic of Tatarstan”.

06/25/2015

Apastovsky Branch

Stabilization of ground bed with lime and backfilling of the mounted water pipes on site “Reconstruction of the auto road Tetiushi – Kamskoye Ustye, km 2+300 – km 11+800 in Tetiushsky district of the Republic of Tatarstan” (1st stage, km 2+300 – km 5+500).

06/25/2015

Aksubaevsky Branch

Construction of the earth bed on site “Reconstruction of the auto road “Drive to village Tuimetkino in Cheremshansky district of the Republic of Tatarstan”.

06/25/2015

Mamadyshsky Branch

Construction of the road bottom layer on site “Construction of the auto road “M-7 “Volga” – “Shemorbash” – Tavlarovo in Rybno-Slobodsky district of the Republic of Tatarstan.

06/24/2015

Aksubaevsky Branch

Works on site “Reconstruction of the auto road “Drive to Brick-making plant in Cheremshansky district of the Republic of Tatarstan”.

06/23/2015

Aksubaevsky Branch

Construction of the earth bed on site “Reconstruction of the auto road “Aksubayevo – Yemelkino – Novaya Kiremet in Aksubayevsky district of the Republic of Tatarstan”.

06/22/2015

Aksubaevsky Branch

As a part of municipal road works program on the local public roads, reinforced concrete water pipe is being mounted on Kosmonavtov and 8 Marta streets in settlement of urban type Aksubayevo.

06/21/2015

Apastovsky Branch

Construction of the earth bed and mounting of corrugated culvert on site “Construction of the auto road Araslanovo-Kulaberdino in Kaibitsky district of the Republic of Tatarstan”.

06/20/2015

Apastovsky Branch

Reconstruction works on site “Reconstruction of the auto road Apastovo – Tabar Cherki, km 0+000 – km 5+485 in Apastovsky district of the Republic of Tatarstan”.

06/19/2015

Apastovsky Branch

Construction of the earth bed on site “Reconstruction of the auto road Tetiushi – Bolshiye tarkhany – Undory – Kashka in Tetiushsky district of the Republic of Tatarstan”.

06/19/2015

Suburban Branch

Upper layer of asphalt-concrete surface made of macadam and mastics mix is finished on Julius Fucik street in Kazan.

06/17/2015

Nizhnekamsky Branch

Construction of macadam bedding is finished on site “Reconstruction of the auto road Ishteryakovo-Nizhnekamsky Industrial hub in Nizhnekamsky district of the Republic of Tatarstan”.

06/17/2015

Suburban Branch

Workers of Suburban branch had started road maintenance works on Dostoyevsky street in Kazan.

06/16/2015

Sabinsky Branch

Works are going on according to the program “Normalization of the road networkof inhabitad localities in Sabinsky municipal district of the Republic of Tatarstan”.

06/16/2015

Sabinsky Branch

Regeneration of traffic surface (first pass) on the auto road Oshtorma Yumya – Novyi Kukmor, km 3+288 – km 6+358 is made as a part of the program “Reconstruction of worn out road surfaces in Kukmorsky district of the Republic of Tatarstan”.

06/13/2015

Aksubaevsky Branch

Reconstruction of the asphalted road network is finished in inhabited localities of Aksubayevsky district of the Republic of Tatarstan (settlement of urban type Aksubayevo, Mazilin and Engels streets).

06/13/2015

Aksubaevsky Branch

Construction of ground bed and corrugated culverts on site “Normalization of route “Krivoozerki – Novaya Alekandrovka – Nizhnyaya Balanda” in Aksubayevsky district of the Republic of Tatarstan”.

06/05/2015

Suburban Branch

“Dubyazy” base is being constructed.

06/02/2015

Suburban Branch

Reconstruction of worn-out layers of asphalt-concrete surface on the auto road “Kazan-Shemordan”.

06/02/2015

Apastovsky Branch

The grass is being cut on roadsides and slopes of the auto roads in Apastovsky and Verkhneuslonsky districts of the Republic of Tatarstan.

06/02/2015

Mamadyshsky Branch

Construction of the bottom layer on the auto road “Ishkeyevo-Nizhniy Takanysh” is finished.

06/01/2015

Suburban Branch

Construction of the reinforced concrete pipes on ramps. Site: “Reconstruction of the auto road Kornoukhovo-Novaya Yrga-Shetnevo-Tulushi, part Kornoukhovo-Novaya Yrga (1st stage) in Rybno-Slobodsky district of the Republic of Tatarstan”.

05/29/2015

Apastovsky Branch

Cold regeneration reconstruction of asphalt-concrete surface is being made on the auto road “Tetiushi – Kamskoye Ustye”, km 16+700 – km 22+500 in Kamsko-Ustiynsky district of the Republic of Tatarstan.

05/29/2015

Apastovsky Branch

On photo: site “Reconstruction of the auto road “Tetiushi – Kamskoye Ustye”, km 2+300 – km 11+800 in Tetiushsky municipal district of the Republic of Tatarstan (1st stage km 2+300 – km 5+500).

05/28/2015

Apastovsky Branch

Roadworks are being conducted on drive to village Urium in Tetiushsky district of the Republic of Tatarstan.

05/26/2015

Nizhnekamsky Branch

Surface layer of asphalt-concrete coating is being laid on site “Normalization of road network in Nizhnekamsky district” in inhabited locality Shingalchi, Lenin street.

05/25/2015

Аrsky Branch

Reconstruction is being made as a part of the program “Reconstruction of the asphalt-concrete road network in Arsky municipal district” in city Arsk on Bankovskaya, Bolshaya and Internatsyonalnaya streets.

05/25/2015

Apastovsky Branch

Reconstruction of worn-out layers on the auto road “Kazan-Ulyanovsk” – Staroye Baryshevo – Kamskoye Ustye, km 43+300 - km 45+810 in Kamsko-Ustyinsky district of the Republic of Tatarstan.

05/25/2015

Workers of Chelninsky branch had started the second stage of reconstruction of the auto road “Naberezhnye Chelny – Sarmanovo”, part km 4+000 – km 10+500 in Tukayevsky district of the Republic of Tatarstan.

05/25/2015

Nizhnekamsky Branch

Construction of earth bed and macadam-and-sand top coat on site “Normalization of road network in settlement Prosti”, Polevaya street.

05/22/2015

Menzelinsky Branch

Upper layer of asphalt-concrete coating made of ЩМА-15 macadam and mastics mix is being laid on site “Menzelinsk – Russkiy Koran – Togashevo” – Kuzembetyevo, part Naratly Kichu – Kadryakovo in Menzelinsky district of the republic of Tatarstan.

05/22/2015

Mamadyshsky Branch

The bushes are being removed from the roadside slopes on territorial auto roads using MIDIFORST bush breaker.

05/21/2015

Mamadyshsky Branch

Reconstruction of worn-out layers of asphalt-concrete surface was successfully made on the auto road M-7 “Volga”.

05/19/2015

Nizhnekamsky Branch

Construction works are being conducted on site “Ishteryakovo – Nizhnekamsky industrial hub”: dismantling of concrete surface and preparation of earth bedding.

05/19/2015

Аrsky Branch

As a part of the program “Normalization of Road supply departments in inhabited localities of Tulyachinsky diatrict of the Republic of Tatarstan”, construction of the road surface with macadam-and-sand mix in village Uzyak.

05/19/2015

Аrsky Branch

Works according to the program “Normalization of Road supply department in settlement Tulyachi” are being conducted on Solnechnaya and Oktyabrskaya streets.

05/19/2015

Mamadyshsky Branch

Reconstruction works on Davydov street in city Mamadysh are finished.

05/18/2015

Apastovsky Branch

Sanation of cracks in asphalt-concrete surface, strengthening of slopes with macadam and installation of new metal safety barriers are being done on the auto road “M7-Volga-Vedenskaya Sloboda”.

05/18/2015

Nizhnekamsky Branch

Pothole repair and reconstruction of worn-out layers of asphalt-concrete surface are made in Nizhnekamsk city.

05/15/2015

Sabinsky Branch

Reconstruction of the road network in settlement of urban type Kukmor, Voroshilov and Lenin streets.

05/08/2015

Apastovsky Branch

Workers of Apastovsky branch had started reconstruction of the auto road “Drive to village Urium” in Tetiushsky district of the Republic of Tatarstan”.

05/08/2015

Apastovsky Branch

Ground bedding is being constructed on site “Reconstruction of the auto road “Apastovo – Tabar - Cherki, km 0+000 – km 5+485 in Apastovsky district of the Republic of Tatarstan”.

05/08/2015

Apastovsky Branch

Cold in-place recycling of subgrade on site “Reconstruction of the auto road “Kazan-Ulyanovsk” – Kamskoye Ustie, km 61+450 – km 66+688 in Kamsko-Ustiynsky district of the Republic of Tatarstan”.

05/08/2015

Аrsky Branch

Reconstruction of asphalt-concrete surface using patching method on the auto road “Drive to city Arsk”.

05/07/2015

Aksubaevsky Branch

Reconstruction of asphalted road network in settlement of urban type Aksubayevo, Mazilin street.

05/04/2015

Menzelinsky Branch

Worn-out layers of asphalt-concrete surface on the auto road “Tynnamasovo – Staroye Tatyshevo” in Aktanyshsky district of the Republic of Tatarstan were successfully reconstructed.

05/02/2015

Aksubaevsky Branch

Rehabilitation of cracks in asphalt-concrete surface on the auto road Chistopol – Aksubayevo – Nurlat in Aksubayevsky municipal district of the Republic of Tatarstan”.