August - September 2011

August - September 2011

09/27/2011

Work for making of substrate layer, foundation of road coating is close to completion on the road near settlement Sosnovyi Bor in Tukaevsky district of RТ.

09/25/2011

Menzelinsky Branch

Work for making of road layers and placing of asphalt-concrete layers is continued at the reconstruction site at the motor road Aktanysh – Muslyumovo – Novye Karmaly in Muslyumovsky district of RТ.

09/24/2011

Аrsky Branch

Work continues at the reconstruction site at the motor road Novyi Kisheet – Sraryi Kisheet in Arsky district of RT within the Federal Program for building approaches to countryside settlements.

09/24/2011

Mamadyshsky Branch

Placing of the lower layer of asphalt-concrete coating close to completion at the motor road Mamadysh – Kukmor – Tulbai in Mamadyshsky district of RТ.

09/24/2011

Mamadyshsky Branch

Asphalt-mixing plant of Mamadyshsky Branch produced 100,000 ton of asphalt-concrete mix (senior engineer Imamiev D.Z.).

09/23/2011

Menzelinsky Branch

Digging and making of foundation for road coating performed at the working site in Menzelinsky district of RT motor road from Highway М-7 "Volga" to Staryi Irkenyash – Tatarskaya Mushuga.

09/23/2011

Apastovsky Branch

At the Apastovsky Branch training seminar “Techniques and organization of work for making the asphalt-concrete coatings” for team foremen of all the Units of the Company (responsible organizer - Deputy Head of Verkhne-Uslonsly Unit Mr. Faizullin R.A.). Seminar was held at the repair site of the motor road Ulanovo – Karatun – Verkhnee Atkozino – Azbaba in Verkhne-Uslonsky district of RТ, where practical training and discussions were held on the problems of placing and compacting of asphalt-concrete mixes.

09/23/2011

Аrsky Branch

Trials of new mower Twose Tornado S-160 (mfd. Great Britain) were conducted at the motor road Kazan –Malmyzh – Kazanbash in Arsky district of RТ.

09/21/2011

Aksubaevsky Branch

The condition of approach to the settlement Maloe Aksubaevo in Aksubaevsky district of RT, coated with transitional type of organic-mineral mix coating after one year of service.

09/17/2011

Apastovsky Branch

Work is finished on making the upper layer of coating at the crossroads of motor road Tetyushi – Bol’shie Tarkhany – Undory – Bessonovo in Tetyushsky district of RТ.

09/17/2011

Apastovsky Branch

Strengthening of waysides with broken rock at the motor road Bol’shoe Frolovo – Cherki – Grishkino in Buinsky District of RТ.

09/17/2011

Аrsky Branch

At the repair site of motor road Sarai Chekurcha – Ker Khaivan in Arsky district of RТ work now is performed at the bridge over river Kis’mes’.

09/17/2011

Apastovsky Branch

Asphalt-mixing plant of Apastovsky Branch produced 100,000 ton of asphalt-concrete mix (senior engineer Minullina L.R.).

09/16/2011

Suburban Branch

The condition of motor road from highway M7-“Volga” to village Il’inskoe in Pestrechinsky district of RT, coated with transitional type of organic-mineral mix coating after two years of service.

09/16/2011

Apastovsky Branch

The team of Verkhne-Uslonsky Unit (foreman Minnegaliev D.M.) performs work for placement of leveling layer of asphalt concrete at the motor road Ulanovo – Karatun – Verkhnee Atkozino – Azbaba in Apastovsky district of RТ.

09/16/2011

Consolidation work is being performed at the reconstruction site of motor road Saklov Bash – Suly - Saklovo.

09/16/2011

Аrsky Branch

At the reconstruction site of motor road Staryi Kyrlai – Utnya in Arsky district of RT of 4.76 km total length only 500 linear m of asphalt-concrete coating remain to be placed over the rectangular drain pipe.

09/15/2011

Suburban Branch

At the repair site of the motor road from highway M-7 “Volga” to Kutlu Bukash – Rybnaya Sloboda, section km 27+450 – km 34+309 in Rybno-Slobodsky district of RT: For even distribution of the load from earth bank of 7 m height, over the prefabricated corrugated drain pipe of 3 m diameter (mfd.JSC “Aleksinstroikonstruktziya”) the earth bank was reinforced with geo-fabric Stabilеnka (mfd.Germany).

09/11/2011

Mamadyshsky Branch

Making of foundation and lower layer of asphalt-concrete coating at the motor road from highway М-7 "Volga" to Kulushchi in Mamadyshsky district of RТ.

09/09/2011

Placing of asphalt comcrete at the motor road Bol’shoe Nurkeevo – Kafdryakovo, section km 12+100 – km 16+700 in Sarmanovsky district of RТ.

09/07/2011

Mamadyshsky Branch

Making of broken-rock foundation at the working site “Bringing the condition of roads and streets in correspondence to the Norms in settlement Tulbaevo” with employment of two-dimension oriented geo-grid Mac-Grid EG-20S.

09/06/2011

Suburban Branch

Put into service is the motor road Staroe Shigaleevo – Pestretzy, section km 11+480 - km 13+480 in Pestrechinsky district of RТ.

09/06/2011

Suburban Branch

Tready to be put into service is the motor road Kazan – Shemordan, section km 29+932 - km 34+551 in Pestrechinsky district of RТ.

09/06/2011

Suburban Branch

Comes to finish the installation of corrugated metal drain pipe of 3 m diameter at the repair site of motor road from highway М-7 "Volga" to Kutlu Bukash – Rybnaya Sloboda, section km 27+450 - km 34+309 in Rybno-Slobodsky district of RТ.

09/06/2011

Mamadyshsky Branch

Put into operation is the motor road from highway М-7 “Volga” to Nizhniya Sun’ – Verkhniya Sun’, section Malaya Sun’ – Verkhniya Sun’ of 4.7 km total length.

09/06/2011

Mamadyshsky Branch

Comes to finish work for digging and installation of drain pipes at the working site “Bringing the condition of roads and streets in correspondence to the Norms in settlement Tulbaevo”, total length 3.1 km.

09/06/2011

Аrsky Branch

Reconstruction of the motor road Staryi Kyrlai – Utnya in Arsky district of RТ, length of section 4.76 km.

09/06/2011

Mamadyshsky Branch

Comes to finish work for making the upper layer of asphalt-concrete coating at the working site “Bringing the condition of roads and streets in correspondence to the Norms in village Dusaevo”, total length 3.3 km.

09/01/2011

Nizhnekamsky Branch

Comes to finish work for placing the asphalt-concrete at the motor road Chistopol’ – Nizhnekamsk, section km 80+620 - km 86+940 near the settlement Borok.

08/31/2011

Suburban Branch

Installation of the metal corrugated pipe of 3 m diameter instead of unserviceable bridge at the repair site of motor road from highway М-7 "Volga" to Kutlu Bukash – Rybnaya Sloboda, section km 27+450 - km 34+309 in Rybno-Slobodsky district of RТ.

08/28/2011

Аrsky Branch

Earth-moving at the motor road Arsk – Tulyachi, section km 19+100 – km 31+100, is performed by scraper detachment of JSC “Alekseebskdorstroy”.

08/27/2011

Apastovsky Branch

Making of upper layer of road coating with broken rock-mastic asphalt-15 at the motor road Tetyushi – Bol’shie Tarkhany – Undory, section km 13+150 – km 19+600 in Tetyushsky district of RТ.

08/27/2011

Apastovsky Branch

Comes to finish the making of roadbed at the motor road Kazan – Ulianovsk – Kamskoe Ust’e in Kamsko-Ust’ensky district of RТ.

08/27/2011

Menzelinsky Branch

Strengthening of waysides finished, now arrangement work is performed at the motor road from highway М-7 "Volga" to Staraya Aleksandrovka - Bikbulovo.

08/26/2011

Menzelinsky Branch

Performing the work for making the roadbed and pavement at the motor road from highway М-7 "Volga" to Staryi Irkenash – Tatarskaya Mushuga in Menzelinsky district of RТ.

08/24/2011

Аrsky Branch

Road-marking work is finished at the repair site at the motor road Arsk – Tulayachi, section km 16+100 - km 19+100 in Tulyachinsky district of RТ.

08/18/2011

Sabinsky Branch

Placing of the upper layer of asphalt-concrete coating and strengthening of waysides with broken rock now finished at the motor road Mamadysh – Kukmor – Karkaus’ Sosmak – Verkhniya Shun’ in Kukmorsky district of RТ.

08/17/2011

Аrsky Branch

Work for making complex pavement at the reconstruction site of motor road Arsk – Border of Mariy El Republic – Kshkar with employment of two-dimension oriented geo-grid Mac-Grid EG-20S.

08/17/2011

Nizhnekamsky Branch

Placing of upper layer of broken rock-mastic asphalt-20 and simultaneous performing the central road marking with employment of tape 3М Stamark, series A380 SD, width 100 mm at the motor road Chistopol’ – Nizhnekamsk, section Detour of township Kamskie Polyany.

08/16/2011

Аrsky Branch

Making of asphalt-concrete coating at the motor road Arsk – Border of Mariy El Republic – Kshkar in Arsky district of RТ.

08/15/2011

Menzelinsky Branch

Earth-moving and assembly of metal corrugated drain pipes at the motor road from highway М-7 "Volga" to Staryi Irkenash – Tatarskaya Mushuga in Mernzelinsky district of RT.

08/13/2011

Apastovsky Branch

Making of upper layer of broken rock-mastic asphalt-20 coating for the full width of roadway at the motor road Kazan – Ulianovsk – Kamskoe Ust’e, section km 26+688 – km 30+750 in Kamsko-Ust’ensky district of RТ.

08/13/2011

Apastovsky Branch

Lower layer of coating is made at the motor road Tetyushi – Bol’shie Tarkhany – Undory, section km 13+150 – km 19+600 in Teyushsky district of RТ.

08/13/2011

Menzelinsky Branch

Repair work is performed at the motor road Aktanysh – Poisevo, section km 9+840 - km 13+440 in Aktanyshsky district of RТ.

08/12/2011

Nizhnekamsky Branch

Harrowing of asphalt-concrete coating is performed at the Town Head Enterprise of Town Public Electric Transport (ГУП ГЭТ) of town Nizhnekamsk.

08/11/2011

Аrsky Branch

Check of consolidation of the ready roadway and making of constructive layers of pavement at the motor road Arsk – Border of Maryi El Republic – Kshkar in Arsky district of RТ.

08/11/2011

Sabinsky Branch

Work if being finished for making the foundation of broken rock, laying of asphalt-concrete coating and making of accesses at the motor road Kazan – Shemordan – Yulbat – Yu.Alan in Sabinsky district of RТ.

08/11/2011

Sabinsky Branch

Making of substrate sand layer finished, work for making broken-rock layer is performed at the motor road Bogatye Saby – Leskhoz – Nyrty, section Bol’shie Nyrty – Srednie Nyrty in Sabinsky district of RТ.

08/11/2011

Sabinsky Branch

Repair work is performed at the mototr road Kazan – Shemordan, section km 86+400 - km 90+400 in Sabinsky district of RТ.

08/09/2011

Work for harrowing of asphalt-concrete coating is performed at the motor road Bol’shoe Nurkeevo – Kadryakovo, section km 12+100 - km 16+700 in Sarmanovsky district of RТ.

08/05/2011

Aksubaevsky Branch

Work for strengthening of heads of culverts is performed at the motor road Chistopol’ – Aksubaevo –Nurlat – Staroe Mokshino in Aksubaevsky district of RТ.

08/01/2011

Menzelinsky Branch

Preliminary work for making of lateral drainage is performed at thr motor road Aktanysh – Poisevo near settlement Zubairovo.