Chronicle of Work06/09/2025 Menzelinsky Branch 06/05/2025 Sabinsky Branch 06/04/2025 Apastovsky Branch 06/03/2025 Apastovsky Branch 06/02/2025 Apastovsky Branch 05/31/2025 Apastovsky Branch 05/30/2025 Aksubaevsky Branch 05/30/2025 Menzelinsky Branch 05/29/2025 Apastovsky Branch 05/28/2025 Menzelinsky Branch 05/27/2025 Аrsky Branch Arsk – Mari EL Republic limits: 11+300 - 14+910 (Arsky district) Construction of surface course with stone mastics (grade 8, thickness 0.04 m). 05/26/2025 Aksubaevsky Branch Access road to barnyard near Aksubayevo settlement: 0+000 – 0+590 (Aksubayevsky district)
Construction of base course with А22Нл asphaltic mix. 05/23/2025 Аrsky Branch
Road maintenance works on local roads in Arsky district of the Republic of Tatarstan (Arsky district) 05/22/2025 Аrsky Branch Koshar – Kliuchi-Sap: 11+524 - 12+924 (Atninsky district)
Strengthening of roadsides with M-400 macadam, layer thickness 0.1 m. 05/22/2025 Аrsky Branch Bolshaya Atnya – Chepchugy: 12+750 - 14+455 (Atninsky district)
Construction of base course using cold regeneration method with Caterpillar RM-500 recycler, layer thickness 0.20 m. 05/20/2025 Menzelinsky Branch Musliumovo – Tatarskiy Shugan: 0+000 - 1+286 (Musliumovsky district)
Construction of base course with А32Нн asphaltic mix is finished. 05/17/2025 Sabinsky Branch Kazan – Shemordan: 97+487 - 100+927 (Sabinsky district)
Construction of surface course with stone mastics (grade 8, thickness 0.04 m). 05/16/2025 Аrsky Branch Koshar – Kliuchi-Sap: 11+524 - 12+924 (Atninsky district)
Construction of surface course with stone mastics (grade 8). 05/16/2025 Suburban Branch M7 “Volga” Moscow-Vladimir-Nizhniy Novgorod-Kazan-Ufa: 878+005 - 940+265; 970+000 - 986+811 (Rybno-Slobodsky district)
Construction of wearing course with SMA-11 using bituminous adhesive PG-34. 05/16/2025 Menzelinsky Branch Musliumovo – Staroye Saitovo: 18+200 - 20+100 (Musliumovsky district)
Construction of leveling course with А16Нн asphalt-concrete mix is finished. 05/16/2025 Menzelinsky Branch Musliumovo – Tatarskiy Shugan: 0+000 - 1+286 (Musliumovsky district)
Construction of base course using cold regeneration method with RM-500 recycler with addition of 2% of ЦЕМ I-42.5Н cement is finished. 05/15/2025 Аrsky Branch Arsk – Mari EL Republic limits: 11+300 - 14+910 (Arsky district)
Construction of leveling course with А16Нн asphalt-concrete mix. 05/14/2025 Apastovsky Branch “Kazan – Ulyanovsk” – Kamskoye Ustye: 54+572 - 56+615 (Kamsko-Ustyinsky district)
Construction of leveling course with А16Нн asphalt-concrete mix is finished. 05/13/2025 Аrsky Branch Koshar – Kliuchi-Sap: 11+524 - 12+924 (Atninsky district)
Construction of leveling course with А16Нн asphalt-concrete mix. 05/13/2025 Apastovsky Branch “Karatun – Cheremshan – Bolshoye Podberezye” – Deushevo – Kushtovo: 9+545 - 11+460 (Apastovsky district)
Construction of water pipes in progress. 05/12/2025 Menzelinsky Branch Musliumovo – Tatarskiy Shugan: 0+000 - 1+286 (Musliumovsky district)
Construction of base course using cold regeneration method with RM-500 recycler with addition of M-800 macadam is finished. 05/12/2025 Mamadyshsky Branch M7 “Volga” Moscow-Vladimir-Nizhniy Novgorod-Kazan-Ufa: 878+005 - 940+265; 970+000 - 986+811 (Rybno-Slobodsky district)
Milling of uplifts and rut roughness, construction of wearing surface. 05/08/2025 Apastovsky Branch Road maintenance on local roads in Kamsko-Ustyinsky district (Kamsko-Ustyinsky district)
Workers form Apastovsky branch had finished reconstruction of worn-out road surfaces in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan. 05/08/2025 Аrsky Branch Koshar – Kliuchi-Sap: 11+524 - 12+924 (Atninsky district)
Milling of asphalted surface. 05/07/2025 Suburban Branch Sredneye Devyatovo – Tatarskiy Yantyk: 1+000 - 8+816; 11+018 - 12+555 (Laishevsky district) Construction of base course using cold regeneration method with recycler with addition of water, enriched sand-and-gravel mix, and portland cement. 05/07/2025 Аrsky Branch Arsk – Mari EL Republic limits: 11+300 - 14+910 (Arsky district)
Milling of asphalted surface and levelling up to mark. |