Million tons of asphalt-concrete mix in Aksubayevsky branch
02-07-2024
As of July 2, 2024 total production of asphalt-concrete mix at Aksubayevsky branch of JSC "Tatavtodor" asphalt plant has reached 1 000 000 tons since its start in 2009. The millionth ton was delivered and celebrated at the surface course construction on site "Construction of auto road "Alekseevskoye-Almetyevsk" as a part of a toll road "Shali" (M-7) – Bavly (M-5)" in the Republic of Tatarstan" (2nd stage, km 43+216 – 89+641, part km 51+500 – 61+400).
Back to the list
|